4 Risk Management Strategies According to the PMP Standard

In project management, risks are uncertain events or conditions that may negatively impact project objectives. The Project Management Professional (PMP) framework identifies four main strategies to handle negative risks: Risk Avoidance, Risk Mitigation, Risk Transfer, and Risk Acceptance. Each strategy represents a different approach to managing risks effectively. Let’s explore these four strategies in detail.

Read more: https://www.pivotpointsecurity.com/risk-tolerance-in-business/


I. Risk Avoidance

Risk avoidance is a strategy that seeks to eliminate the risk entirely by adjusting the project plan or scope so that the risk no longer exists. In other words, the project team chooses to avoid high-risk activities or conditions, thereby completely removing the potential threat from the project. This is the most radical approach, as successful avoidance means the negative impact will never occur.

Avoidance is typically used for critical, unacceptable risks. If a risk has a high probability of occurrence and could cause significant damage to cost, schedule, or core objectives, the project manager may choose to avoid it. However, avoiding all risks is not always feasible or desirable, as it may mean losing potential opportunities or benefits. Therefore, the project manager must carefully evaluate and avoid only those risks that are truly unacceptable.

Advantages:

  • Completely eliminates the threat, ensuring the risk has no impact on the project.

  • Provides full protection for key project objectives from severe risks.

Disadvantages:

  • Often requires significant changes in project plans, scope, or objectives, which can increase cost and delay timelines.

  • May result in missed opportunities or competitive advantages if avoidance means rejecting new technologies or innovative approaches.

Example:
A software team plans to use a new open-source library to develop an advanced feature but discovers the library is unstable and contains major bugs that could affect quality and schedule. To avoid the risk, the team decides to use a proven, stable technology instead, thus eliminating the threat entirely—though sacrificing potential performance improvements.


II. Risk Mitigation

Risk mitigation involves taking proactive measures to reduce either the likelihood or impact of a risk event. Instead of removing the risk, the project team focuses on controlling or minimizing it to an acceptable level. This is one of the most commonly used strategies, allowing projects to proceed as planned while maintaining appropriate safeguards.

Mitigation is used when a risk cannot be fully avoided but can be reduced. It’s suitable for medium to high probability risks with significant impacts, provided that the team can reasonably reduce their effects. When the cost of mitigation is justified by the benefits (e.g., preventing project failure), mitigation is the right choice.

Advantages:

  • Decreases the likelihood or severity of risks through preventive actions.

  • Enables proactive preparation, increasing project stability and success rates.

Disadvantages:

  • Requires additional resources (time, budget, manpower) to implement mitigation activities such as extra testing, training, or backup systems.

  • Does not completely eliminate the risk — residual risk always remains.

Example:
A web service provider worries that its system may crash under heavy traffic. To mitigate the risk, engineers optimize the codebase, enhance the database structure, and set up load balancing. These actions reduce both the probability and potential impact of system failure.


III. Risk Transfer

Risk transfer involves shifting responsibility and impact of a risk to a third party through contracts, outsourcing, or insurance. The risk still exists, but if it materializes, the third party assumes financial or operational consequences. A common example is buying insurance: the project pays a premium, and the insurer compensates for losses if the risk occurs. Similarly, outsourcing certain activities also transfers some risks to external vendors.

This strategy is suitable when another entity is better equipped to handle the risk or when the project wants to protect itself from large potential losses by paying a smaller fee. Financial, legal, or highly technical risks are common candidates for transfer.

Advantages:

  • Protects the project from direct financial or operational losses.

  • Leverages the expertise and resources of specialized third parties.

Disadvantages:

  • Increases project costs due to insurance or outsourcing fees.

  • Reduces direct control and introduces dependency on the external party’s reliability.

  • The risk itself does not disappear — if the third party fails, the project may still face consequences.

Example:
A government agency needs to develop an administrative management app but lacks internal technical expertise. To transfer the risk, they outsource development to a specialized software company. The risk of poor quality is mitigated by the vendor’s experience, but if the vendor underperforms, the agency still faces potential project failure.


IV. Risk Acceptance

Risk acceptance occurs when the project team decides not to take proactive action against a known risk. Instead of avoiding, mitigating, or transferring, the project acknowledges and lives with the risk. This means that if the risk materializes, the team will manage it with available resources and contingency plans. Acceptance neither reduces the likelihood nor the impact but can be a rational decision in certain cases.

This strategy is appropriate for risks with low probability or minor impact, where the cost of response outweighs potential damage. It’s also chosen when no viable solution exists to avoid or mitigate the risk. Teams should, however, establish a contingency plan to react quickly if the risk does occur.

Advantages:

  • Saves time and resources for higher-priority risks.

  • Simple and efficient; if the risk never occurs, the project benefits from avoided costs.

Disadvantages:

  • The project bears full impact if the risk happens.

  • Requires the team to accept a degree of uncertainty or discomfort.

  • Can lead to reactive management if contingency plans are not well-prepared.

Example:
A mobile app project identifies a minor UI issue that appears only on older devices and doesn’t affect core functionality. Fixing it would delay the release by a week. The team chooses to accept the risk, launch on schedule, and plan a patch later if necessary.


V. Comparison of Risk Management Strategies

Strategy Description When to Apply Advantages Disadvantages
Avoidance Eliminates the cause of the risk entirely. When the risk is critical and unacceptable. Risk is completely removed; no negative impact. May require plan or scope changes; costly; may miss opportunities.
Mitigation Reduces likelihood or impact. When the risk can be reduced to an acceptable level. Decreases danger and impact; proactive management. Requires extra resources; cannot eliminate risk entirely.
Transfer Shifts risk to a third party (contract, insurance). When a third party can handle the risk better. Protects project financially; uses external expertise. Increases cost; reduces control; depends on third party’s performance.
Acceptance Takes no proactive action; manages consequences if risk occurs. When risk is minor or cost of response exceeds potential loss. Saves resources; simple to manage. Full exposure if risk occurs; may appear risky or unprepared.

VI. Key Takeaways When Applying the Four Strategies

  • Avoidance: Use sparingly — only for catastrophic or project-ending risks. Avoiding everything may lead to missed opportunities.

  • Mitigation: Should be planned from the start — prevention is more effective than reaction.

  • Transfer: Use as a safety net, not to relinquish responsibility. Maintain oversight even when risks are outsourced.

  • Acceptance: Should be a conscious, calculated decision. Always log accepted risks in the risk register and prepare contingency plans if the impact could be moderate.